Bascom City of San Jose Library & Community Center

Carroll Engineering provided boundary and topographic surveys for this appx. 2-acre site to accommodate the design of a new 44,943 sq. ft. Library and Community Center.

We also provided complete grading and drainage plans, underground utility plans for storm, sanitary and water systems, and minor off-site improvement plans for Bascom Avenue and Del Mar Avenue in San Jose.  The drawings included complete geometric layout plans as well.

C3 Storm Water Management Plans were also prepared.  The C3 plans incorporated the use of pervious pavements to mitigate runoff concerns.

The project was LEED certified.

Branham & Kirk Office/Retail Building

Carroll Engineering provided complete boundary and topographic surveys for this 0.56-acre site and public street frontage in preparation for a new 6,987 sq. ft. building and parking areas.

The project required new storm drain and sanitary sewer laterals to Branham Lane crossing an existing 16 inch diameter water main.  This required exposing the water main to determine its exact location and gaining approval from the local water purveyor for the crossing, and all to accommodate the elevation of the on-site utility requirements.

Final grading and underground utility plans and C3 Storm Water Management Plans were prepared as well as complete new frontage improvements for Branham Lane and Kirk Avenue and all processed through the City of San Jose for approval.

Blossom Hill & Snell Office/Retail Building

Carroll Engineering provided site development permit documentation and processing through the City of San Jose Planning department including C3 storm water design, preliminary grading, underground and off-site improvement plans for the new 7,970 sq. ft. building and parking areas.

We also provided complete boundary and detailed topographic surveys of the one half acre site and half streets of Blossom Hill Road and Snell Avenue in order to complete the design plans.  The survey included underground utility surveys to better determine existing utilities at the existing gas station site.

Further work will be the final grading, storm sewer, sanitary sewer and C3 design for the site and complete new street frontage improvements for Blossom Hill Road and Snell Avenue including a new sanitary sewer lateral to Snell Avenue.