Campbell Union High School District – Performing Arts Centers
Carroll Engineering participated with the design team for the construction of Performing Arts Centers (PAC) at five high schools in the Campbell Union High School District: Branham High School, Leigh High School, Del Mar High School, Prospect High School and Westmont High School. The projects began in 2008 and were completed in late 2010. Topographic surveys were completed at each school site and utilized for the design of the PAC’s. Each project consisted of the addition of the building, adjacent pavement and landscaping, walkways and realignment of frontage road in some instances. Civil plans consisted of Demolition Plans, Grading Plans, Underground Utilities Plans, Horizontal Control Plans, and Notes & Details. Erosion Control Plans were also included. Plans for each site showed drainage courses and new storm drains to existing storm drains on-site. Sanitary sewers and domestic water were designed based on existing systems on each site. Rerouting of fire lines was included.